38 results
20-F/A
2023 FY
EX-4.7
DRD
DRDGold Ltd.
30 Oct 23
Annual report (foreign) (amended)
5:51pm
ASI SA As Supplier Dated 11 May 2023
TABLE OF CONTENTS Clause number and description Page 1. DEFINITIONS AND INTERPRETATION … ....................................................................................................................... 9 4. GENERAL OBLIGATIONS OF THE SUPPLIER ........................................................................ 10 5
20-F/A
2023 FY
DRD
DRDGold Ltd.
30 Oct 23
Annual report (foreign) (amended)
5:51pm
), unauthorized access to, or disclosure of, personnel or supplier information, corruption of our data or of our systems, reputational damage … on water to transport material over large distances and for processing.
Power Supply: power is provided by the national power supplier, Eskom
20-F/A
2023 FY
EX-96.1
DRD
DRDGold Ltd.
30 Oct 23
Annual report (foreign) (amended)
5:51pm
with the national electricity supplier - Electricity Supply Commission (Eskom), suppling the operation with power (Item 15). Infrastructure includes … power supplier, Eskom. The national power supply and distribution infrastructure is severely destressed and this results in frequent disruptions
20-F/A
2023 FY
EX-96.2
DRD
DRDGold Ltd.
30 Oct 23
Annual report (foreign) (amended)
5:51pm
by Eskom, the national power supplier, or by the local municipality. Like most parts of South Africa, the operations are affected by occasional load … offices. Power is sourced from the national supplier, the Electricity Supply Commission (Eskom). There is a power supply from the 17# Shaft substation
20-F/A
EX-96.1
fowufk2zk5e44m28 fh
12 Apr 23
Annual report (foreign) (amended)
4:05pm
20-F/A
EX-96.1
9nnkpjiwc7
8 Nov 22
Annual report (foreign) (amended)
4:43pm
6-K
0upp9k vvizn1p
1 Sep 20
Current report (foreign)
7:53am
6-K
EX-99
qgomxmbmn6hxqhmu3j
12 Feb 20
Current report (foreign)
10:41am